Home / Reefer Restacks
The freight shifted. We put it back together at the trailer door.
Reefer Restacks for Chilled Freight That Shifted in Transit
When chilled stacks lean, leave gaps in the middle, or walk toward the nose, the next dock may refuse the trailer. We take the load apart, build it tight, wrap it, and bar the unit.
How a chilled load drifts
Sudden stops and empty pockets let stacks drift. Fruit leans. Dairy walks forward. A receiver looking at that from the door often sends the trailer away. We rebuild it so the next stop can take it.
What the job covers
- Take the shifted freight out of the trailer
- Restack each pallet so the corners line up
- Wrap and strap the build
- Load it back tight and lock it with bars
- Work at the trailer door, or reefer to reefer, so chilled cargo is not left sitting open
Rewraps
Film that tore, wrap that went slack, or a pallet that looks too loose for the miles still ahead. We wrap it again at the door. That is frequently what keeps the next receiver from bouncing it.
Frozen loads
If the freight is frozen and already on the floor, use the freezer restack page. It is the same yard and the same staff, just colder cargo. Call and we will point you to the right door.
Can you see a lean or a hole in the stack from the door?
Call any hour. We will say whether we can take the trailer and when.